Mahindra Solar: What’s Happening Now

Posted By: Rise Team|Dated: March 19, 2012

The government of India has a solar mission to generate 20,000 megawatts of solar power by 2022. Find out what’s happening now to get this done!

Related Links:

  • http://www.linkedin.com/andyappan ANDY APPAN

    CSP SOLAR TECHNOLOGY AVAILABLE
    .TOWER, PARABOLA  TROUGH >  100/400  FOCUS UNITSALT > AIRBOILER+ TURBINE >  ANDY ROTARY ENGINE COST 4 MN$/MW

  • http://www.linkedin.com/andyappan ANDY APPAN

    CSP + CPV + FUEL   HYBRID
    NO  BOILER, NO TURBINE, ANDY ROTARY ENGINE
    SIZE :600 cm  DIA. 120 cm  LONG 12 kL VOL   1000 MW

  • pranil mastakar

    My project caters to the same needs at
    http://www.sparktherise.com/projectdetail.php?pid=6279